CALOOSA LAKES HOMES
Nokomis,
FL
Custom Residential Payment
Inspections:
- currently reviewing contractor draw
request schedule items for
completion
- reviewing plans, specs, "doc" box
county inspections and
posted
information
- taking front and rear digital photos
and then will narrate
- field filling out percentage of
completion checklist and report of
findings
- ready to make any takeoffs/costing
of any incomplete items for
holdback
cost - doing several $500,000.00
homes at same subdivision
location |

|
 |
MR. & MRS. JON BREWER
Sarasota, FL
Residential Property Inspection:
- performed CSI 16 Division inspection on existing home for buyers
- used various electronic testing equipment and articulating ladder
- checked working order of all systems and submitted full report to
buyers
- offered cost-to-correct deficiency estimating to buyers as an option
- digital photos taken |
SONIA MEJIAS FAMILY Sarasota,
FL
Residential Property Inspection:
- performed CSI 16 Division inspection
on existing home for buyer/s
- used various electronic testing
equipment and articulating ladder
- checked working order of all systems
and submitted full report to
buyer/s -
offered cost-to-correct deficiency
estimating to buyers as an
option -
digital photos taken 49 |
 |
 |
STOCKYARD STEAKHOUSE
RESTAURANT Sarasota, FL
Claims Estimating:
- worked up claim costs from site visit and owners' conversation
- cost estimate was used to settle dispute and avoid litigation |
BILL BUCK CHEVROLET
DEALERSHIP Venice, FL
Eminent Domain Cost Estimating:
- estimated building component
renovations costs due to road curve
relocation
- worked closely with appraiser on
items affected |
 |
 |
LONGBOAT KEY NORTH FIRE
STATION
Longboat Key, FL
Progress Estimating & Value
Engineering:
- worked side-by-side with architect
on this $1.2 million dollar project
- performed preliminary/schematic/design-
development/
construction document estimates
- created numerous cost saving solutions valued at $ 800,000.00 to
achieve budget |
TELECOMMUNICATIONS FACILITY
Osprey, FL
Pre-Bid Estimating & Value
Engineering:
- produced a CSI 16 Division Detailed Construction Cost Estimate from
95%
plans
- generated all estimating in-house with some sub calls to review
special cost
areas
- applied value engineering to bring
project within owners' budget
|
 |
 |
SARASOTA HIGH SCHOOL ADDITIONS
Sarasota, FL
Progress Estimating & Value Engineering:
- performed preliminary/schematic/design-
development/construction document estimates
- used CSI 16 Division Range/Parameter/Single-Line/Multi-Line/
Detailed estimate methods
- value engineering was used extensively
to bring project into owners' budget
- also three other associated on-site projects were estimated by KCC |
SIESTA KEY RESIDENCE
Sarasota, FL
Eminent Domain Cost Estimating:
- estimated site component renovation costs due to widening of main road
- worked closely with attorney on items affected |
 |
 |
SARASOTA HIGH SCHOOL MEDIA CENTER
Sarasota, FL
Progress Estimating:
- performed preliminary/schematic/design-
development/construction document estimates
- actual bids were within 8% accuracy of our CD estimate!
More Pictures
|